Arbind Kumar Yadav - Site Engineer
CERTIFIED SITE ENGINEER
Arbind Kumar Yadav
Regency Construction Company Pvt. Ltd
NPT Time: Loading... Active On Site

Precision Site Execution.
Rock-Solid Structural Integrity.

B.Tech Civil Engineer (71% Distinction) with rigorous on-site experience managing multi-story reinforced concrete construction. Directing excavation, rebar checking, shuttering alignment, RMC concrete pours, BOQ/BBS preparation, and ETABS structural analysis with zero tolerance for error.

05+
Key Projects Executed
71%
B.Tech Distinction Score
04x
Competitions & Honors
100%
BOQ & BBS Accuracy
BIM STRUCTURAL VIEWER // ACTIVE
CONSTRUCTION PROGRESSION:
Click 1st point on structure...
BIM ELEMENT

Structural Inspection

Engineering QA/QC Data

Click glowing hotspots on the model to view structural details.

X: 38.0m   Y: 28.0m   Z: 42.0m   EL: +11.0m
Click glowing pins or drag to orbit 3D construction site

Site Engineer Daily Field Protocol

How Arbind Kumar Yadav ensures structural safety, dimensional compliance, and on-time milestones every single working day on the construction site.

07:30 AM • PHASE 01

Toolbox Talk & Safety Inspection

Conducting mandatory morning safety inductions with bar-benders, shuttering carpenters, and masons. Enforcing PPE, safety harnesses for height work, and perimeter net integrity under NPTEL Fire Safety standards.

09:00 AM • PHASE 02

Rebar & BBS Verification

Physical on-slab rebar inspection against structural drawings: verifying stirrup spacing, chair bars, development lengths ($L_d$), lap splices, and cover blocks (25mm slab, 40mm column) prior to pour approvals.

11:30 AM • PHASE 03

Formwork & Shuttering Level Survey

Checking formwork verticality, prop bracing, and slab line levels using Total Station and optical auto-levels. Guaranteeing zero formwork deflection under hydraulic wet concrete pressure.

02:00 PM • PHASE 04

RMC Slump & Concrete QA/QC

Directing Ready-Mix Concrete (RMC) transit mixers at the pump. Conducting standard slump cone tests (75–100mm) and casting $150\text{mm}$ concrete test cubes for 7-day and 28-day compressive crushing records.

04:30 PM • PHASE 05

Subcontractor BOQ Reconciliation

Recording daily concrete yardage, steel tonnage consumed, and shuttering surface areas in the site Measurement Book (MB). Verifying subcontractor billing claims against actual on-site progress.

06:00 PM • PHASE 06

DPR & Consultant Coordination

Compiling Daily Progress Reports (DPR), resolving site execution clashes with structural consultants, updating 3D BIM models, and setting tomorrow's material pouring schedules.

Civil Site Engineer & Structural Specialist

Passionate about turning 2D architectural blueprints and ETABS analytical models into durable, earthquake-resilient physical structures.

Arbind Kumar Yadav - Civil Site Engineer
ARBIND KUMAR YADAV B.TECH CIVIL • RK UNIVERSITY

I am a dedicated Civil Engineer with hands-on experience in high-standard site management, quantity estimation, and structural modeling. Having graduated with 71% Distinction in B.Tech Civil Engineering from RK University and executed comprehensive civil works at Regency Construction Company Pvt. Ltd, I bring a balance of theoretical analysis and tough on-site leadership.

Public Relations & Subcontractor Liaising
On-Site Leadership & Teamwork
Time Management & Milestone Schedules
Effective Technical Communication
Languages Spoken
English, Nepali, Maithili, Hindi, Bhojpuri
Personal Interests
Photography, Cricket, Travelling
2021 – 2025
B.Tech in Civil Engineering
RK University, Rajkot, Gujarat
Distinction: 71% Aggregate
2017 – 2019
(+2) Higher Secondary Science
Nepa Mega College, Babarmahal, Kathmandu
Science Stream Completed

Professional Work Experience

Demonstrated on-site engineering execution across budgets, quality control, scheduling, and consultant coordination.

Site Engineer

Regency Construction Company Pvt. Ltd
Dec 2024 – Jan 2026
  • Supervised all aspects of civil construction works from substructure excavation and foundation raft casting to superstructure framing.
  • Prepared comprehensive project budgets, resource schedules, and detailed quantity estimates for structural procurement.
  • Maintained rigorous daily, weekly, and monthly construction progress schedules using critical path tracking.
  • Coordinated design revisions with architectural consultants and resolved site engineering conflicts swiftly.
  • Prepared detailed itemized Bill of Quantities (BOQ) and Bar Bending Schedules (BBS) for material reconciliation.
  • Liaised directly with clients and municipal consultants during technical progress and milestone review meetings.
  • Monitored project progress, documented engineering variations, and conducted subcontractor evaluations and contract compliance.

Engineering Skills & Software Toolkit

Proficiency across structural engineering computation, CAD drafting, site surveying, and quality management.

Design & 3D Modeling

AutoCAD 92%
3D Modeling & BIM 88%
Enscape Rendering 85%
ETABS (Structural Analysis) 82%

Quantity Surveying & Estimation

Billing of Quantity (BOQ) 95%
BBS (Bar Bending Schedule) 94%
Cost Estimation & Rate Analysis 90%
Structural Valuation 84%

Site Management & Office

Project Execution & Supervision 92%
MS Excel & Data Analysis 96%
Construction Fire Safety (NPTEL) 88%
Subcontractor Contract Mgmt 86%

Featured Civil Engineering Projects

A selection of structural designs, materials testing, cost estimations, and heritage conservation works.

Commercial & Residential Building STRUCTURAL & BIM

Commercial & Residential Multi-Story Building

Comprehensive structural modeling, ETABS seismic analysis, and Enscape photorealistic 3D visualization for a modern G+5 mixed-use development.

AutoCAD ETABS Enscape G+5 Framed
Concrete Mixed Design (M-20) QUALITY & LAB

Concrete Mixed Design (M-20 Grade)

Precision mix proportioning, water-cement optimization (0.50), slump workability tests, and 28-day compressive crushing strength validation exceeding 28 MPa.

IS 10262 Slump Test CTM Crush Testing QA/QC
PBL (G+1) Cost Estimation ESTIMATION & BOQ

PBL (G+1) Structural Cost & BOQ Estimation

End-to-end quantity takeoff, structural rebar Bar Bending Schedules (BBS), itemized Bill of Quantities, and market rate analysis with zero procurement variance.

BOQ Preparation BBS Rebar Rate Analysis MS Excel
Plastic Waste in Bituminous Pavement SUSTAINABLE HIGHWAYS

Use of Plastic Waste in Bituminous Pavement

Eco-friendly highway engineering research utilizing shredded polymer waste (HDPE/PET 6-8%) to enhance asphalt binder stability, prevent rutting, and divert landfill waste.

Marshall Stability Polymer Bitumen Green Roads Award Winner
Falcha Work Heritage Restoration HERITAGE CONSERVATION

Falcha Work (Traditional Nepalese Heritage Restoration)

Structural rehabilitation and seismic stabilization of historic Newari public rest pavilions in Kathmandu Valley, integrating authentic timber joinery with modern tie-rods.

Timber Joinery Surkhi Mortar Seismic Retrofit Conservation

Competitions & Certifications

Honors earned across technical design challenges, structural dynamics competitions, and professional certifications.

2023 • WINNER

Winner in Eco Build Competition

Techno Planet • Sustainable Concrete & Green Materials
2022 • RUNNER-UP

Runner-Up in Build Shake Competition

Seismic Resistant Structural Shake Table Testing
2023 • PARTICIPANT

Seismograph Design Competition

Earthquake Ground Motion & Sensor Mechanics
2024 • PARTICIPANT

Eco Build Competition

Advanced Recycled Waste Highway Applications
2024 • NPTEL COURSE

Construction Fire Safety Management

National Programme on Technology Enhanced Learning
2025 – 2026 • ACCREDITATION

Internship & Sai Krishna Education

Professional Civil Engineering Field Certification

Civil Engineering Calculators Lab

Interactive computational tools for on-site quantity estimation and steel reinforcement scheduling.

Concrete Mix Material Estimator

Calculate exact cement bags, sand volume, coarse aggregate, and water requirements based on wet pour volume using dry density factor (1.54).

Volumetric Proportions 1 : 1.5 : 3 (w/c: 0.50)
Cement
Sand
Aggregates
Cement Required (50kg Bags): 83 Bags (4,150 kg)
Fine Aggregate (Sand): 4.20 m³ (148.3 cft)
Coarse Aggregate (Gravel): 8.40 m³ (296.6 cft)
Estimated Water Requirement: 2,075 Liters

Bar Bending Schedule (BBS) Weight Calculator

Calculate steel rebar linear weight, total tonnage, and procurement mass using standard civil engineering formula: Weight = (D² / 162.2) × L.

12
Fe-500D TMT Bar (12 mm • #4)
Standard Beam & Slab Tension Reinforcement
Unit Weight (D² / 162.2): 0.888 kg/m
Total Reinforcement Weight: 266.34 kg
Procurement Tonnage: 0.266 MT

Get in Touch with Arbind

Available for site engineer roles, structural consulting, BOQ/BBS assignments, and 3D architectural modeling.

Quick Project Scope:
Direct Link: Message delivers immediately to Arbind's WhatsApp (+977 9861421537) or Gmail (arbindydv58@gmail.com).